COUNTRY-OF-ORIGIN DUTY RECORD

HTS 8501 from Taiwan

Electric motors and generators (excluding generating sets)

For Taiwan the 2026 Section 301 action sets a TOTAL of 10%: the duty is the general rate where that is already 10% or more, and 10% otherwise, with nothing added on top of it.

Import cost estimate
Search another product
Rates as of 11/22/2026 17:06 EST. Schedule edition 2026HTSRev23 · notices last checked Nov 22, 2026, 10:58 AM EST · 71 ten-digit lines · 0% to 29% percentage range. An estimate from public sources, not a customs ruling.

Duty analysis · line 8501.10.20.00

Click any code in the table to change the line
Total included duty10%6.7% + 3.3%
Example customs value$10,000USD · example only
Included duty on the example value$1,000.00Before fees · the percentage part only
What is coveredIncluded, conditional and not checked are different states; not checked never means 0%5 duty layers
Included
General (column 1) duty

Included. USITC Harmonized Tariff Schedule 2026HTSRev23

Included
Section 301

Included where a rule in our table applies. China's older lists (Lists 1, 2, 3, 4A and the 2024 four-year-review increases) are loaded by product code with the exclusions now in force; the 2026 country action is loaded by country, with set totals for the EU, Japan, South Korea, Switzerland and Taiwan. Country-specific exemption lists (USMCA goods, CAFTA-DR textiles, UK and EU lists) are not modelled. Confirm each line with a broker. USTR: Section 301 investigations · USITC Harmonized Tariff Schedule, chapter 99

Conditional
Section 232

Partly included: plain-percentage rows are added, conditional and country-deal rates are shown but not added. Plain-percentage rows from the USITC chapter 99 notes are added, one row per line (vehicles and parts ahead of metals ahead of wood); conditional and country-deal rates are listed, not added. Light-vehicle parts and truck parts are both 25% and the schedule does not say whether a part on both lists pays once or twice: the site shows one. Official source: CBP: Section 232 steel and aluminum FAQs · Commerce (BIS): Section 232 investigations

Checked
IEEPA / reciprocal

Checked: none in force found. We found no IEEPA or reciprocal duty in force. The nine IEEPA tariff actions named in Executive Order 14389 were ended by it (signed 2026-02-20), and the temporary 10% Section 122 surcharge that followed was set to expire on 2026-07-24 with no extension found in the Federal Register. A Section 301 action that began on 2026-07-24 is counted in the Section 301 layer above. Canada has a separate Section 338 duty on some products; we cannot say which lines. Official source: Federal Register: Executive Order 14389, Ending Certain Tariff Actions · Federal Register: Proclamation 11012, temporary import surcharge · CBP: IEEPA tariff FAQs

Not checked
Antidumping / countervailing (AD/CVD)

None found in our list. None found in our list of 757 orders; the list can miss orders newer than their first review notice. Official source: CBP: antidumping and countervailing duty · Commerce (ITA): ACCESS case search · CBP: AD/CVD case data and search · Commerce: ADCVD proceedings

Tariff newsNotices that name heading 8501 and Taiwan together1 notice
Rules applied to TaiwanEvery added-duty rule in our table that reaches a line of this heading2 rules
  1. set total 10% Section 301 since 2026-07-24 — source (9903.05.75 (rate at or above 10%), 9903.05.76 (below 10%))

    2026 Section 301 SET TOTAL for Taiwan: nothing is added on top. If the line's general rate is 10% or more the duty is just the general rate (heading 9903.05.75); if it is lower the whole duty is 10% (heading 9903.05.76). A line with no plain percentage rate (cents per kilo, mixed) cannot be computed here.

  2. 25% Section 232 since 2025-11-01 — source (9903.74.08)

    +25% on parts of medium- and heavy-duty vehicles (list 38(i)), every country except Canada and Mexico (USMCA-qualifying parts pay nothing, heading 9903.74.10). A manufacturer's import adjustment offset may reduce the duty.

Section 232What the proclamations say about chapter 85; plain percentages are already in the duty abovenone here

These are summaries of the official proclamations. Where the tariff schedule notes give a plain percentage for your line and country, it is already in the duty above (see the layer list). Rates that depend on a fact only you know (the share of metal by weight, U.S.-made metal, a country deal, a USMCA claim) are listed but not added. Check your own line against the official list or ask your broker.

No Section 232 program in our table is centred on chapter 85. Lists of derivative products can still reach lines in other chapters: Steel, aluminum and copper articles and derivatives; Automobiles and automobile parts; Timber, lumber, upholstered wooden furniture, kitchen cabinets and vanities; Medium- and heavy-duty vehicles, parts and buses; Pharmaceuticals and pharmaceutical ingredients; Semiconductors (certain advanced chips).

Included duty breakdown

Of under 18.65 W › Synchronous, valued not over $4 each

Duty componentIncluded rate
Included General HTS duty6.7%
Included Section 301 · brings the line to the set total of 10%3.3%
Total included duty10%
Duty at $10,000 of customs value$1,000.00

The percentage part only. Section 232 is added only where a plain percentage applies to the line and Taiwan; conditional and country-deal rates are listed, not added. AD/CVD is never in a total. Rates as of 11/22/2026 17:06 EST.

Duty by line

71 tariff lines · Taiwan · pick your own 10-digit code from your classification or broker; the rate that applies to you is the one on your line

71 lines shown

CodeProductGeneral rateAdded dutiesTotal percentageOn $10,000
Of under 18.65 W › Synchronous, valued not over $4 each6.7%3.3% Section 301 · brings the line to the set total of 10%10%$1,000.00
Other › AC4.4%5.6% Section 301 · brings the line to the set total of 10%10%$1,000.00
Other › Brushless4.4%5.6% Section 301 · brings the line to the set total of 10%10%$1,000.00
Other › Other4.4%5.6% Section 301 · brings the line to the set total of 10%10%$1,000.00
Other › Other4.4%5.6% Section 301 · brings the line to the set total of 10%10%$1,000.00
Of 18.65 W or more but not exceeding 37.5 W › AC2.8%7.2% Section 301 · brings the line to the set total of 10%10%$1,000.00
Of 18.65 W or more but not exceeding 37.5 W › Brushless2.8%7.2% Section 301 · brings the line to the set total of 10%10%$1,000.00
Of 18.65 W or more but not exceeding 37.5 W › Other2.8%7.2% Section 301 · brings the line to the set total of 10%10%$1,000.00
Of 18.65 W or more but not exceeding 37.5 W › Other2.8%7.2% Section 301 · brings the line to the set total of 10%10%$1,000.00
Universal AC/DC motors of an output exceeding 37.5 W › Exceeding 37.5 W but not exceeding 74.6 W3.3%6.7% Section 301 · brings the line to the set total of 10%10%$1,000.00
Universal AC/DC motors of an output exceeding 37.5 W › Exceeding 74.6 W but not exceeding 735 W4%6% Section 301 · brings the line to the set total of 10%10%$1,000.00
Universal AC/DC motors of an output exceeding 37.5 W › Exceeding 735 W but under 746 W3.3%none in our table3.3%$330.00
Universal AC/DC motors of an output exceeding 37.5 W › Other2.4%none in our table2.4%$240.00
Motors › Exceeding 37.5 W but not exceeding 74.6 W2.8%7.2% Section 301 · brings the line to the set total of 10%10%$1,000.00
Motors › Exceeding 74.6 W but not exceeding 735 W4%6% Section 301 · brings the line to the set total of 10%10%$1,000.00
Motors › Exceeding 735 W but under 746 W3.3%none in our table3.3%$330.00
Motors › Other2.4%none in our table2.4%$240.00
Of an output not exceeding 750 W › Generators2.5%none in our table2.5%$250.00
Motors › Exceeding 750 W but not exceeding 14.92 kW2.9%25% Section 232 · adds27.9%$2,790.00
Of an output exceeding 750 W but not exceeding 75 kW › Electric motors of a kind used as the primary source of mechanical power for electrically powered vehicles of subheadings 8703.40, 8703.50, 8703.60, 8703.70 or 8703.80Freenone in our table0%$0.00
Other › For use in civil aircraftFreenone in our table0%$0.00
Other › OtherFree25% Section 232 · adds25%$2,500.00
Of an output exceeding 750 W but not exceeding 75 kW › Generators2%25% Section 232 · adds27%$2,700.00
Exceeding 75 kW but under 149.2 kW › For use in civil aircraftFreenone in our table0%$0.00
Exceeding 75 kW but under 149.2 kW › OtherFree25% Section 232 · adds25%$2,500.00
Motors › 149.2 kW or more but not exceeding 150 kW2.8%25% Section 232 · adds27.8%$2,780.00
Other › Not exceeding 373 kW2.8%25% Section 232 · adds27.8%$2,780.00
Other › Other2.8%25% Section 232 · adds27.8%$2,780.00
Of an output exceeding 75 kW but not exceeding 375 kW › Generators2.5%25% Section 232 · adds27.5%$2,750.00
Of an output exceeding 375 kW › Motors2.8%25% Section 232 · adds27.8%$2,780.00
Of an output exceeding 375 kW › Generators2%25% Section 232 · adds27%$2,700.00
Of an output exceeding 37.5 W but not exceeding 74.6 W › Gear motors3.3%25% Section 232 · adds28.3%$2,830.00
Of an output exceeding 37.5 W but not exceeding 74.6 W › Other3.3%25% Section 232 · adds28.3%$2,830.00
Of an output exceeding 74.6 W but not exceeding 735 W › Gear motors4%25% Section 232 · adds29%$2,900.00
Of an output exceeding 74.6 W but not exceeding 735 W › Other4%25% Section 232 · adds29%$2,900.00
Of an output exceeding 735 W but under 746 W › Gear motors3.3%25% Section 232 · adds28.3%$2,830.00
Of an output exceeding 735 W but under 746 W › Other3.3%25% Section 232 · adds28.3%$2,830.00
Other › Gear motors3.7%25% Section 232 · adds28.7%$2,870.00
Other › Other3.7%25% Section 232 · adds28.7%$2,870.00
Exceeding 37.5 W but not exceeding 74.6 W › Gear motors2.5%25% Section 232 · adds27.5%$2,750.00
Exceeding 37.5 W but not exceeding 74.6 W › Other2.5%25% Section 232 · adds27.5%$2,750.00
Exceeding 74.6 W but not exceeding 735 W › Gear motors2.5%25% Section 232 · adds27.5%$2,750.00
Exceeding 74.6 W but not exceeding 735 W › Other2.5%25% Section 232 · adds27.5%$2,750.00
Exceeding 735 W but under 746 W › Gear motors3.3%25% Section 232 · adds28.3%$2,830.00
Exceeding 735 W but under 746 W › Other3.3%25% Section 232 · adds28.3%$2,830.00
Other › Gear motors2.5%25% Section 232 · adds27.5%$2,750.00
Other › Other2.5%25% Section 232 · adds27.5%$2,750.00
Of an output exceeding 750 W but not exceeding 75 kW › Exceeding 750 W but not exceeding 14.92 kW3.7%25% Section 232 · adds28.7%$2,870.00
Other › For use in civil aircraftFreenone in our table0%$0.00
Other › OtherFree25% Section 232 · adds25%$2,500.00
Exceeding 75 kW but under 149.2 kW › For use in civil aircraftFreenone in our table0%$0.00
Exceeding 75 kW but under 149.2 kW › OtherFreenone in our table0%$0.00
Of an output exceeding 75 kW › 149.2 kW or more but not exceeding 150 kW4.2%none in our table4.2%$420.00
Other › Not exceeding 373 kW2.8%7.2% Section 301 · brings the line to the set total of 10%10%$1,000.00
Other › Other2.8%7.2% Section 301 · brings the line to the set total of 10%10%$1,000.00
AC generators (alternators), other than photovoltaic generators › Of an output not exceeding 75 kVA2.5%none in our table2.5%$250.00
AC generators (alternators), other than photovoltaic generators › Of an output exceeding 75 kVA but not exceeding 375 kVA2.5%none in our table2.5%$250.00
AC generators (alternators), other than photovoltaic generators › Of an output exceeding 375 kVA but not exceeding 750 kVA2.5%none in our table2.5%$250.00
Of an output exceeding 750 kVA › For wind-powered generating sets classified within 8502.31.002.4%7.6% Section 301 · brings the line to the set total of 10%10%$1,000.00
Of an output exceeding 750 kVA › Exceeding 750 kVA but not exceeding 10,000 kVA2.4%7.6% Section 301 · brings the line to the set total of 10%10%$1,000.00
Of an output exceeding 750 kVA › Exceeding 10,000 kVA but not exceeding 40,000 kVA2.4%7.6% Section 301 · brings the line to the set total of 10%10%$1,000.00
Of an output exceeding 750 kVA › Other2.4%7.6% Section 301 · brings the line to the set total of 10%10%$1,000.00
Photovoltaic DC generators › Of an output not exceeding 50 W2.5%none in our table2.5%$250.00
Of an output exceeding 50 W › Of an output not exceeding 750 W2.5%none in our table2.5%$250.00
Of an output exceeding 50 W › Of an output exceeding 750 W but not exceeding 75 kW2%none in our table2%$200.00
Of an output exceeding 50 W › Of an output exceeding 75 kW but not exceeding 375 kW2.5%none in our table2.5%$250.00
Of an output exceeding 50 W › Other2%none in our table2%$200.00
Photovoltaic AC generators › Of an output not exceeding 75 kVA2.5%none in our table2.5%$250.00
Photovoltaic AC generators › Of an output exceeding 75 kVA but not exceeding 375 kVA2.5%none in our table2.5%$250.00
Photovoltaic AC generators › Of an output exceeding 375 kVA but not exceeding 750 kVA2.5%none in our table2.5%$250.00
Photovoltaic AC generators › Other2.4%7.6% Section 301 · brings the line to the set total of 10%10%$1,000.00

The last column is the percentage part only, on $10,000 of customs value.

Sponsor this page

Your firm, in front of the brokers and importers who read this page. One sponsor per page, clearly labelled, for a flat monthly fee. No ad network, no bidding, no tracking.

How sponsorship works